Continuous M&V · Apparatus № 03
Load Duration Curve
This is real — every 15-minute reading for the year, sorted hardest to easiest. This is what we use, and what our platform builds on its own.
The far-left corner is the peak the building hits only a few hours a year — yet it sizes every wire, transformer, and chiller. The long flat tail on the right is the base load that runs every hour.
Two levers live in one curve: trim the brutal left edge to cut demand charges, lower the right tail to cut everything else.